日韩高清不卡在线|影音先锋成人|爽爽av|天堂中文在线看,成人视屏在线观看,精品伊人久久,成人一级免费

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.